Fahrplanstabilität
Stability variations assessment in rail manufacturing
Project details
Duration
02.2015-12.2015
Sponsor
external page FOT Federal Office of Transport
Staff
Professor U. Weidmann, M. Sojka and A. Toletti
Summary
The aim of the project was the integration of timetable stability as assessment criteria for the project evaluation "Strategisches Entwicklungsprogramm Bahninfrastruktur (STEP)" from the Federal Office for Transport (FOT). The Swiss Federal Railways (SBB) use a software called OnTime from the Consulting company TrafIT for assessment of timetable stability. Read more